Arbor Homes was started with a specific purpose and plan, and that was to create homes, mortgage systems and procedures that would enable as many people as possible to purchase a brand new home. Our homes are designed with the buyer in mind and include many features for which other builders charge extra.
Before Construction
Management During Construction
- Pre-Construction Meeting with Quality Control Manager
- Pre-Drywall Meeting with Quality Control Manager
- Final Walk-Through Day of Closing
- Customer Orientation Meeting Prior to Closing
- Arbor Homes Customer Assurance Contract
- Homes Built to BAGI Standards
Construction
- Insulated Concrete Slab Foundation
- Engineered Floor and Roof Truss Systems
- Stick Built (16" on Load Bearing Walls)
- Drywall Nailed and Screwed
- 2x12 Framed Exterior Headers Above Doors & Windows
- "California" Corners and Ladder Lead Framing
- Insulated Steel Exterior Doors
- Easy-To-Clean Low-E Vinyl Windows and Patio Door with Screens Grilles on Front Elevation
Electrical Plumbing, HVAC
- Electric Heat Pump and Air Conditioning with 50 Gallon Electric Water Heater
- Optional Gas Furnace and Air Conditioning with 40 Gallon Gas Water Heater
- 200 Amp Electrical Service
- 2 Telephone and 2 Cable Pre-Wires
- Ice Maker Hookup
- 2 Weather Protected Exterior Electrical Outlets
- 2 Weather Protected Exterior Hose Bibs
- Overhead Garage Door Opener Pre-Wire
- Door Chimes
Interior Finish
- Smooth Walls with Textured Ceilings
- Painted Interior Trim
- Painted Six-Panel Doors
- Full Sized Kitchen Doors
- Full Sized Kitchen Pantry
- Linen Closets
- Ventilated Wire Shelving in Closets
- Larger Master Closet
- Merilatt Cabinets, Choice of Oak Cabinet Finish
- Laminate Countertops with End Splashes, Choice of Colors
- Designer Light Package
- Moen Faucets
- Stainless Steel Double Sink in Kitchen with Hand Sprayer and Garbage Disposal
- G.E. Self Cleaning Range and Dishwasher
- Re-Circulating Range Hood
- Washer & Dryer Hookups
- Shaw Home Foundations Carpet
- Armstrong Resilient No Wax Vinyl Flooring
- Vinyl Flooring in all Bathrooms
Exterior Finish
- Fiberglass Seal-Down Shingles (25 Year Warranty)
- Maintenance Free Vinyl Siding
- Choice of Exterior Color Schemes
- Painted Wood Soffit and Trim
- Factory Finished Seamless Gutters with Splash Blocks
- Landscape Package with Seeded Yard
- Concrete Driveway, Patio, House Walk and Rear Stoop
- Front Exterior Coach Light
- Community Standard Mailbox
Warranties & Service